WITH GLOBETROTTERS ENGINEERING CORP.  (2011-PRESENT)

WARMING HOUSE PROTOTYPE DESIGNS FOR EXISTING RAIL STATIONS

Client: Metra         Locations: Various (10) throughout Chicago and Suburbs, IL
Description: Small (100 sf), Medium (350 sf), and Large (400 sf) Fully Enclosed Shelter Buildings at Existing Rail Stations. Shelters will be ventilated and utilize on-demand electric heat.
Role: Project Architect and Designer, Concept Design through Design Development; Design Drawings and Models. Currently in Design Development.
September 2021 – Present

BISHOP FORD MAINTENANCE YARD IMPROVEMENTS

Client: IL Dept. of Transportation/Capital Development Board         Location: South Holland, IL
Description: New 5,000 sf Office and Maintenance Facility Addition to Existing Maintenance Storage Building.
Role: Project Manager, Lead Architect, Design Development through Construction Documents; Design and Construction Documents, Drawings, Models and Specifications.
February 2022 – Present

REPLACE EXTERIOR WALL SYSTEMS AT OAKTON COMMUNITY COLLEGE

Client: IL Community College Board/Capital Development Board         Location: Skokie, IL
Description: Removal and replacement of entire exterior insulated metal panel wall assembly throughout original campus, including addition of new weather resistant backup wall assembly to be integrated with existing masonry walls and storefront systems.
Role: Project Manager, Lead Architect, Design Development through Construction Documents; Design and Construction Documents, Drawings, Models and Specifications. Currently Under Construction.
October 2021 – Present

DAN RYAN MAINTENANCE FACILITY

Client: IL Dept. of Transportation/Capital Development Board         Location: Chicago, IL
Description: New 11,000 sf Maintenance Facility with office, locker room, vehicle storage, wash facilities, and maintenance bays with complete vehicle fluid distribution system; Renovation of Existing Storage Buildings.
Role: Project Manager, Lead Architect and Designer, Schematic Design through Construction Documents; Design and Construction Documents, Drawings, Models and Specifications.
February 2020 – Present

Client: Pace Suburban Bus         Location: Schaumburg, IL
Description: Expansion of existing surface parking lot to include adjacent 0.76 acre lot with reconfigured bus drive entry and additional parking, site lighting, and landscaping features. Demolition and replacement of existing restroom and utility kiosk with new fully accessible 1,400 sf shelter building including waiting areas, public restrooms, drivers’ private restroom, and utility functions. Refinishing of existing outdoor canopy structure.
Role: Project Architect and Designer, Schematic Design through Construction Documents; Design and Construction Drawings and Models. Currently Under Construction.
November 2019 – Present

Client: Chicago Housing Authority         Location: Chicago, IL
Description: Existing senior high-rise building, ground floor expansion and reconfiguration including new accessible entry vestibules. Interior renovation of various public areas including community rooms and laundry rooms. Upgrades and improvements to 16th floor outdoor terrace. Complete exterior building envelope masonry and concrete repairs and restoration.
Role: Project Architect and Designer, Schematic Design through Construction Documents; Design and Construction Drawings and Models.
December 2019 – November 2020

RICKOVER NAVAL ACADEMY

Client: Chicago Public Schools         Location: Chicago, IL
Description: Interior and exterior renovation, upgrade to CPS standards, and accessibility improvements at an existing school campus.
Role: Project Architect, Design Development through Construction; Construction Drawings and Models; Construction Administration.
December 2018 – March 2020

Client: Metra         Location: Chicago, IL
Description: Aesthetic upgrades and improvements and new lighting along the existing train station platform and stair entry access
Roles: Design Team Member; Project Architect, Schematic Design through Construction; Design and Construction Drawings and Models; Construction Administration.
February 2017 – December 2017

Client: Department of Water Management         Location: Chicago, IL
Description: Interior improvements and exterior building envelope restoration, repairs and historic preservation.
Roles: Building Assessment and Design Team Member; Project Architect, Schematic Design through Construction; Assessment Reports, Design and Construction Drawings; Construction Administration alongside Construction Management Consultant.
March 2014 – June 2018

Client: Housing Authority of Cook County         Location: Skokie, IL
Description: Existing senior high-rise building, interior renovation and accessibility upgrades throughout public areas. Interior renovation of all apartment units (100+ total) including 20% accessibility conversion.
Roles: Building Assessment and Design; Project Architect, Schematic Design through Construction; Assessment Reports, Design and Construction Drawings; Construction Administration.
March 2015 – April 2017

JUDGE SLATER ANNEX

Client: Chicago Housing Authority         Location: Chicago, IL
Description: Existing senior building, interior renovation and accessibility upgrades throughout public areas. Interior renovation of all apartment units (100+ total) including 20% accessibility conversion.
Roles: Building Assessment and Design; Project Architect, Schematic Design through Construction Documents; Assessment Reports & Construction Drawings.
November 2012 – December 2016

Client: Chicago Housing Authority         Location: Chicago, IL
Description: Interior life safety improvements at various existing multi-unit high-rise and mid-rise buildings, including fire alarm, sprinkler systems, and accessibility improvements.
Roles: Building Assessment and Design; Project Architect, Schematic Design through Construction; Assessment Reports, Design and Construction Drawings; Construction Administration.
August 2012 – May 2015

ASSESSMENT OF WATER PUMPING STATIONS

Client: Department of Water Management         Location: Chicago, IL
Description: Full facility assessment and condition reports for maintenance programming, improvements, and capital budgeting at 5 Pumping Stations throughout the city. Building assessment condition report sections included architectural, structural, site, and MEP systems.
Roles: Building Assessment Team Member, Assessment Reports.
February 2012 – September 2012

INDEPENDENT WORK (2009-2011)

Organizer: Cleveland Design Competition         Location: Cleveland, OH
Description: Design for a Multi-Modal Transportation Center in downtown Cleveland at the north end of the historic Mall. Program includes platforms for Amtrak, commuter, and local rail lines along with associated ticket, waiting, and lounge areas. Also included are a visitor’s center, rental car facilities, commuter bike facilities, local and interstate bus stations, retail, and parking.
October 2009 – March 2010

Client: Goers Family         Location: Arlington Heights, IL
Description: New entry canopy for an existing residence
July 2009

WITH DANIEL P. COFFEY ASSOCIATES (2005-2009)

GERMANIA PLACE

Client: Kimco Realty         Location: Chicago, IL
Description: Concept design for adaptive use build-out and renovation of an existing historic building, including 40,000 sf of retail space and new rooftop residential loft units in expanded attic space. (unbuilt)
Roles: Schematic Design Drawings and Revit Models.
April 2008 – May 2009

168 N. MICHIGAN AVENUE

Client: Kimco Realty         Location: Chicago, IL
Description: Concept design for renovation of exterior shell and interior core and lobby space of an existing historic building. (unbuilt)
Roles: Schematic Design Drawings and Revit Models.
March 2008 – May 2009

QUABBIN RESORT

Location: Belchertown, MA
Description: Concept design for 156 acre planned development at a wetland and former state hospital site. Design involved adaptive reuse of existing hospital facilities along with new construction. Program included hotel, spa, health/wellness center, conference, townhomes and condos, retail, museum, train station, and equestrian center. (unbuilt)
Roles: Planning and Schematic Design Drawings.
December 2006 – August 2007

UPTOWN THEATER

Location: Chicago, IL
Description: Concept design for renovation of unused existing historical theater building. Design involved expansion of stage and back-of-house functions, as well as additional parking at the adjacent property. (unbuilt)
Roles: Planning and Schematic Design Drawings.
September 2006 – November 2006

NAPERVILLE PERFORMING ARTS CENTER DEVELOPMENT

Location: Naperville, IL
Description: Concept design for a 19 Acre Development at 5th Ave. between Washington St. and Wright St., North of the Metra Commuter Station: Multi-Site Development with Performing Arts Complex, 499 Condominium Units, 49 Townhouse Units, 16 Single Family Homes, Retail, and Expansion of Commuter Parking Spaces (1720 Total Commuter Parking Spaces for a 126% increase). (unbuilt)
Roles: Planning and Schematic Design Drawings.
December 2005 – October 2006

WITH TORCHIA ASSOCIATES (2004-2005)

HARRINGTON COLLEGE OF DESIGN

Client: Same        Location: Chicago, IL
Description: Multi-phase renovation and expansion of existing interior build-out in office space at 200 W. Madison St., including the addition of a new 7,870 SF 1ST floor & mezzanine space for additional classrooms and gallery functions.
Roles: Design Team Member; Design and Construction Drawings.
February 2004 – March 2005

NORTH FEDERAL SAVINGS BANK

Location: Chicago, IL
Description: Concept design for interior and exterior renovation of existing bank building. (unbuilt)
Roles: Design Team Member; Schematic Design and Concept Drawings.
July 2004 – February 2005

ALLSCRIPTS, INC.

Client: Same       Location: Chicago, IL
Description: New 10,900 SF interior office build-out at the Merchandise Mart.
Roles: Space Planning and Design Team Member; Design and Construction Drawings; Construction Administration.
August 2004 – December 2004

WITH LOEBL, SCHLOSSMAN, & HACKL, INC. (2000-2003)

GRAND PIER CENTER

Client: Lend Lease Real Estate Management       Location: Chicago, IL
Description: New Mixed-Use Residential and Retail Development.
Role: Design Drawings, and Construction Documents & Drawings.
October 2000 – February 2001 & September 2003 – October 2003

Client: Lend Lease Real Estate Management       Location: Deerfield, IL
Description: 4 phase expansion and renovation of existing shopping center.
Role: Renderings, Design Drawings, and Construction Documents & Drawings.
March 2001 – October 2003

Client: Advocate Healthcare       Location: Barrington, IL
Description: New cardiac care center with 44 patient rooms. 58,500 sf 2 story + basement north addition to existing hospital.
Role: Design Drawings and Construction Documents & Drawings.
November 2002 – August 2003

HOME